Summary report for "11app.com" (monthly stats)

Quick navigation: Traffic summary Adwords keywords & texts Organic keywords Competitors

Title: 11app.com free windows software downloads - 11app.com

Description: free windows software downloads, The software directory for freeware and shareware download at http://www.11app.com.

Description: free windows software downloads, The software directory for freeware and shareware download at http://www.11app.com.

Advertising budget: N/A

This site in Alpha Directory: 1 11 11a


Approximate SE paid and organic traffic

Traffic Est. Cost
Organic keywords 193.82 $87.76*
Paid keywords N/A N/A
* — "Est. Cost" for organic traffic means amount of money the site owner would pay for such traffic if he bought it in PPC systems.

Try our new SERPTrends addon

SERPTrends add-on allows one to monitor SERP changes and view SEM parameters for sites while using Google, Yahoo! or BING search engines on the fly. Add-on adds trends and a drop-down box with SEM parameters near each search result.

Learn more about SERP Trends addon »



Organic keywords

Top cost equivalent positions (view all 146)   Top traffic positions (view all 146)   Top positions (view all 146)  
  Keyword Cost Equiv. Position     Keyword Traffic Position     Keyword   Position  
1. xtractor plus $15.60  5    1. msn spy monitor 2009 11  9    1. spy ferret   4   
2. spy ferret $8.62  4    2. xtractor plus 10  5    2. xtractor plus   5   
3. winbackup 2.0 $7.84  8    3. flv2swf 10  10    3. keylogger stopper   5   
4. audio copier $6.99  10    4. smart email recovery 9    4. advanced efs data recovery 4.30   6   
5. keylogger stopper $6.68  5    5. smart pc recorder 4.1 8    5. goldleo mp3 tag editor   6   
6. outlook conduit $6.64  20    6. outlook conduit 20    6. datacore uptempo   6   
7. spyware dialers $6.56  8    7. spy ferret 4    7. resource grabber   7   
8. messenger remover $2.76  11    8. keylogger stopper 5    8. dating pro 2008   7   

Competitors for "11app.com"

Bleepingcomputer.com: Bleeping Computer - Computer Help and Discussion

A free web based community and discussion forum for answering Computer Help, Security, and Technical questions asked by the Novice Computer User

Keywords: desktop security; security tool; hijackthis; antivirus soft; best spyware remover;

Paid traffic cost: N/A

En.kioskea.net: Kioskea - Computing community

Kioskea - Troubleshoot, Get help, Learning to computers and new technologies: computers, networks, software, databases, programming languages.

Keywords: netlog; orkut login; limewire; limewire download; picnik;

Paid traffic cost: N/A

Soft29.com: dvd to mp4, mac dvd ripper copy, avi mpeg wmv flv ipod video converter

Keywords: amv converter; amv convert; videos amv; dvd to ipod; fairuse4wm;

Paid traffic cost: N/A

Freenew.net: FreeApps Download, All Must-have Free Apps in One Click | FreeNew

FreeApps helps you download all must-have free apps in one single click. Download free applications now!

Keywords: todorelatos; silive; utorrent free download; heine katalog; limewire free;

Paid traffic cost: N/A

Gggware.com:

Keywords: spy eliminator; data unerase; spyware dialers; kill adware; adware eliminator;

Paid traffic cost: N/A

Downloads.yahoo.com: Yahoo! Downloads has no Software for Your Operating System

Unsupported Operating System page for Yahoo! Downloads

Keywords: internet explorer; downloads; download internet explorer; explorer 8; internet explorer 8;

Paid traffic cost: $1.15M

Brothersoft.com: Free software download,Over 200000 software free downloads

Free software download,The biggest software directory for freeware and shareware download at brothersoft.com.

Keywords: brothersoft; religious software; download free software; voila mail; cairo;

Paid traffic cost: N/A

Downloadsofts.com: Free software download, directory of shareware and freeware

DownloadSofts.com is collection of shareware and freeware available for download.

Keywords: myspace login; igs viewer; stp viewer; dictation 2005; sopcast 3.0 3;

Paid traffic cost: N/A

Download.cnet.com: Free Software Downloads and Reviews - Download.com

Find the software you're looking for at Download.com, the most comprehensive source for free-to-try software downloads on the Web.

Keywords: download software; youtube; spyware removers; file compression programs; file compression program;

Paid traffic cost: $132.88K

Kb.hpwebos.com:

Keywords: hp; hp com; palm tungsten e2; palm z22; www.hp.com;

Paid traffic cost: N/A

Experts.missouristate.edu: Dashboard - Expert Documentation

Keywords: cisco systems vpn client; microsoft office powerpoint; whentowork; outlook conduit; cisco systems vpn;

Paid traffic cost: N/A

Tclinks.net: Web Design SEO Search Engine Optimization eCommerce Database Website Network Computer Programming

Tri-Cities based TCLinks provides professional web design, search engine optimization (SEO), eCommerce solutions, database-driven websites, network configuration and administration, computer programming, website hosting and onsite computer repair and maintenance.

Keywords: winbackup; server running; winbackup 2.0; web server operating system; web server os;

Paid traffic cost: N/A

Quick navigation:

Site info

Traffic summary

Adwords keywords & texts

Organic keywords

Competitors

Other top sites:

ltes-antioch-ca.schoolloop.com

lte-scientific.co.uk

ltesignaling.blogspot.com

ltesimplified.blogspot.com

ltes.org

Recently processed sites:

kpha.associationcareernetwork.com

kphaigh.com

kpha-ky.org

kpha.net

kphanet.org


Keyword:
Seen on:
Seen URL:
Position:
Clicks per Month:
Keyword avg. CPC:
Monthly Cost Equivalent (avg. cpc * clicks):



Keyword:
Keyword Avg.CPC:
Seen on:
Seen URL: N/A
Page no.:
Ads Block Position:
Ad Position: